05 — DALGA BAU · Hamburg · since 2000
Exterior render and cement render in Hamburg
Exterior render protects masonry from the weather and shapes a building’s appearance. DALGA BAU applies exterior and cement render for new build and existing buildings – to DIN standards in all techniques.
Scope of work
- Exterior render on masonry
- Cement and lime-cement render
- Plinth render in the splash zone
- Exterior renovation render for damp and salt damage
- Insulating render to improve thermal protection
- Render repair for cracks and spalling
- Facade mouldings, window surrounds, rustication and decorative elements
- Finishing render in various textures, e.g. scraped or rubbed finish
Render types at a glance
Exterior renders differ mainly in their binder – and therefore in strength, moisture behaviour and appearance. The right render depends on the substrate, the exposure and the desired look; we advise on site.
- Lime-cement render – the standard on masonry: strong, weather-resistant and breathable, as base coat and finish
- Cement render – especially hard and water-resistant, for plinths and the splash zone
- Lime render – soft and highly breathable, compatible with historic masonry in older buildings
- Exterior renovation render – for damp, salt-laden facades and plinths: salts are stored in the pore structure, moisture can evaporate and the surface stays dry and intact
- Insulating render – lightweight render with insulating aggregates; improves thermal protection where ETICS is not possible, e.g. on articulated period facades
- Silicate and silicone resin render – thin finishing renders: silicate is mineral and breathable, silicone resin is water-repellent and resists dirt
Base coat and finishing render
Exterior render is usually applied in two coats: the base coat evens out irregularities and forms the load-bearing layer, while the finishing render provides texture and weather protection. In the plinth zone, particularly durable cement or lime-cement renders are used.
Application
Exterior render is applied in suitable weather – without frost, rain or strong sun during application and curing. We plan the works accordingly and protect fresh surfaces.
Frequently asked questions
When can exterior render be applied?
As a rule, only at air and substrate temperatures above +5 °C, with no frost, rain or strong sunshine during application and curing. Exact limits are given in the manufacturer’s instructions.
Do I have to insulate my facade under the GEG?
There is no general obligation. However, if the render on more than 10 % of a facade’s area is renewed, the GEG sets minimum requirements for the thermal insulation of the external wall (U-value 0.24 W/(m²K)). Exemptions are possible in individual cases.